Wedding Countdown Ticker

Friday, October 24, 2008

Wooly Slippers






Project info
Wooly Slippers
Pocketbook Slippers by Lisa Vienneau & Allison Barrett
Knitting
Me
One size
Needle and yarn
US 7 / 4.5 mm
: Acrylic
1.6 skeins = 96.0 yards (87.8m)
Solid
Pink

Tuesday, October 21, 2008

Thanksgiving in Miami

I need help! I'll be spending thanksgiving day and weekend in Miami with my cousin and her husband's family and there are three items I'd like to buy but have no clue, and I'm sure they'll have no clue as well, where to buy them so ATTENTION all Christians (or anyone who might know) in Miami where can I get the following:

1. An Electronics Store where I can buy this item (if it has the shape of a microphone even better :D i.e. ) ?
2. A MUSIC STORE where I can buy CD's by Keith and Kristyn Getty and Sovereign Grace Music?
3. A Christian Book Store where I can buy the ESV Bible study?


This post will be up up until a few days before my trip, I leave november 26th. Any help will be greatly appreciated!

Monday, October 20, 2008

Knitting Daily



Have you joined their mailing list yet? You should, they've got really great lessons and techniques on knitting, pictures, a forum, free patterns (and that is always a plus) and a lovely blog with weekly tips.
Today's Tip: How to Choose the Perfect Yarn

Sunday, October 12, 2008

Caron Simply Shrug




Finally got around to knitting the Shrug This pattern again with modifications...I casted 10 extra stitches and increased the arm stitches to about 7 more on each side..
EDIT:
Sorry, forgot to post the pattern detail here's a plus:
Project info
Shrug This by Toni Kayser Weiner
Knitting
Made For: My sister
a larger size than the pattern offers
Needle and yarn
US 10 / 6.0 mm
Caron Simply Soft Ombre
1 skeins = 254.0 yards (232.3m)
: striped
Sew Crafty, NY

Wednesday, October 01, 2008

Another Slouchy Copy Cat Hat



I casted on 93 stitches this time, and increased the stitches to 135 with a little formula I devised.
(1 + n + 1)/2= X [why not n+2? its the same thing I've just written it that way so you'll know that each 1 is the increase you'll be doing in between stitches]
X being the amount of stitches that you'll be adding to the amount of stitches you already have.
x + n= Y
Y being the total amount of stitches in your needles, knowing this will help you decide how many stitches you want to have and how to get multiples of 5 in order to correctly knit the Faux Cable Eyelet pattern.
Example: (lets use the amount of stitches the pattern calls for: 76)
n=76
(76+2)/2=
78/2= 39
X = 39
X+n=
76+39= 115
Just like the pattern says it will increase to.
In my case I casted on 93 stitches, using the formula I got 141 sts total (140.5) I only wanted 135 sts cause I was in a hurry and had only 1 skein of Cascade 220 (but after I finished the hat I still had some yarn left over, so It think it wouldn't have made much difference had I increased it to 140)
How to avoid having those 6 extra stitches? By skipping an increase stitch every 31 stitches. (thats how many stitches per needle I have)
Sorry about the bad quality pictures, we were on our way to the airport.

My knitter's geek code

KCR+++ Exp SPM Steel++@ Wood+ Pl+ Syn(+) Cot+++ Lux+ Wool+ Stash++ Scale+ Fin+ Ent? FI++* Int++@ Lace++ Felt++* Tex++* Flat++@Circ++@DPNS[5]ML2* !Swatch GaugeDK(++)W(+++)F(+++)S(+++) KIP(+++) EZ+ FO+(9) WIP(++) Blog++ SNB- ALTCr+Sw+
What's yours?
*dying to try it!